It takes about 10 days for us to get the materials for this item. The manufacturing period of 6V1.2AH is 15 days. So the delivery time for this item is 25 to 30 days.
The high-grade WPC doors supplied by Kondak contain medical grade resin raw materials and the doors are manufactured by Aerospace Science and Technology at one time extrusion to guarantee its most premium technical performance.
The advanced LiFePO4 battery design includes various protection measures including high temperature thermal fuses, flame retardant additives and pressure relief valves.
Building integrated photovoltaics (BIPV) refers to building components which fulfil classic functions such as thermal insulation, protection against wind and weather or also architectural functions, in addition to generating electricity. And as the integr
Hand crank tarp system kit: built for dump truck body and dump trailer. Heavy duty vinyl coated tarp or mesh tarp and retention bow can be applied. (sold separately)please check more details below
A company specializing in electronic materials and electronic components. Long-term cash acquisition of TI, XILINX, ATMEL, ALTERA, AD, ST, ON and other brands of various ICs, chips, memories, flash memories, crystals, high-frequency Tube, CPU, BGA, and ot
A vintage 'photographers studio' style floor lamp, old & new wood legs and chrome plating shade . Adjustable height wooden tripod legs, with metal hinges and large adjustable lamp head finished in polished chrome.
We have been in steel area for more than ten years,focus on producing 4130 steel tube.After acid pickling, cold rolling, cold drawn, and then adopt advanced technology for heat treatment (NBK status) to produce steel pipes with surface: bright, smooth.We