Negotiable
The date of payment from buyers deliver within days
Hebei
Long-term effective
2020-02-11 10:21
378
Company Profile
Hebei Mortmain Rubber and Plastic Technology Co., LtdBy certification [File Integrity]
Contact:mortmain(Mr.)
Email:
Telephone:
Phone:
Area:Hebei
Address:Hebei
Website:http://www.mtmformwork.com/ http://mortmain.cinv-intr.com/
Thickness(mm) |
Length*Width(mm) |
Weight(kg) |
12 |
1220*2440 |
22-23 |
15 |
1220*2440 |
26-27 |
16 |
1220*2440 |
28-29 |
18 |
1220*2440 |
32-33 |
The comparison between plastic formwork and aluminium formwork
1, The aluminum alloy template must be used in standard high rise buildings, in order to reduce the use of costs (construction of a single building below 30 floors is not suggested, only if the phased construction);
2, Every thing must be very accurate whether in the design, or the needs of the owners of the structural drawings and construction drawings if using aluminum alloy template; in addition, size can not be modified; ( while plastic formwrk can be cut according to the need. )
3, One-time investment is high, very expensive.
4, The surface of concrete and aluminum will play a chemical reaction and the plate will not be smooth after several times. small bubbles appear.
5, Aluminum template is not available for the basement construction.
http://www.mtmformwork.com/
Duplex Roller Chain
price:Negotiable
White Kraft Paper Shopping Bags
price:Negotiable
Engine Timing Tool for BMW Mini Cooper R55 R56 R57 R60 N12 N13 N14 N16 N18
price:Negotiable
CNC Stainless Steel Parts
price:Negotiable
High Precision Copper Strip
price:Negotiable
Commercial Stone Grain Mill for Sale
price:Negotiable